A Lose Hero in the Castle of the Succubi
2D games
About the game
It is a game to meet Succubus at Demon Castle.
The hero is cursed and cannot escape - no matter how hard he tries.
He is always carried by a succubus as he moves around the environment.
Last update: 2021-10-19
Released: 2021-10-07
Creator (developer): Dieselmine
Censored: No
Version: Final
OS: Windows
Language: English
Genre:
How to install:
Developer Notes:
Walk around the various parts of the Demon Castle and talk to Succubus.
Screenshots
Downloads
A_Lose_Hero_in_the_Castle_of_the_Succubi-c7078a9755.xgames.rar
320 MB
Related Games
Magical Girl Ai Plus (v1.0) by colors
Description:A sudden mutation strikes a certain town. A series of bizarre crimes begin to occur.Then, a girl named Ai suddenly appeared.It had never been there before, but one day it suddenly began to exist as if it were a given, something that was always there.While everyone around her paid no attention, the protagonist was the only one who noticed something was wrong with her.Her true identity was that of a warrior sent from another world.Prioritizing the stability of the other world, "love" is not necessarily on humanity's side.What fate awaits the protagonist as he becomes embroiled in a battle against demons—"fluctuations"?Last update: 2026-09-30Released: 2009-04-03OriginalName: 魔法少女アイAliases: Mahou Shoujo Ai PlusCreator (developer): colorsTranslator:Censored: Yes (Mosaics)Version: 1.0OS: WindowsLanguage: English ()Voice: JapaneseLenght: Short (~8 hours)VNDB:Store:Genre:2DCG, Censored, Fantasy, Japanese Game, Magical Girl, BDSM, Tentacles, Rape, Male Protagonist, Multiple Endings, Sexual Harassment, Monster, Titfuck, Vaginal Sex, Creampie, Multiple Penetration, Oral Sex, Anal Sex, Group Sex, Big Tits, Big Ass, Bukkake, VoicedHow to install:1. Extract and run.2. If the game doesn't launch, run the game_install.batTranslator Notes:Translated using Qwen3.8 27b heretic uncensored model in thinking mode.. This took over 24 hours to process due to the model attempting to keep context, flow and tone correct but there still may be some things off. The game engine was also a pain being so old and touchy with even the slightest byte change. I have not tested the whole game only maybe 5% but all appears to be working.Edit: Corrected some mismatched and untranslated names.Edit 2: Fixed some untranslated text. This old game engine has a 40 byte text limit per window and the full English translation does not always fit. Some longer sentences needed to be split over 2 dialog boxes which may appear as it was cut off. Also added proper word wrapping.Main Menu & Save/Load Menu are not translatedIf game doesn't launch, run game_install.bat to set a registry Key for the game
Let’s Steal Away My Beloved Nurse Sister (v1.0) by Hentai Penguin
Description:Ever since he could remember, MC has lived in the hospital. His beloved Mina-oneechan has been gently and attentively taking care of him day after day. Shota used to innocently tell her, “When I grow up, I’m going to marry you, Mina-oneechan.”However, as MC entered puberty, a possessiveness he couldn’t quite understand, along with other inexplicable emotions, began to sprout in his heart. One day, MC accidentally discovers that Mina-oneechan is actually already engaged—to his own attending physician, no less!NOTE: Just after the 4th choice in the game, you are supposed to have the option Always Dash set to off otherwise the message keeps popping upLast update: 2026-09-27Released: 2026-06-05Original Name: 大好きな看護師姉さんを寝取ろう~けどぉー他の男たちにも狙われていたAliases: Daisuki na kangoshi neesan o netorou ~kedoo hoka no otokotachi ni mo nerawarete itaCreator (developer): Hentai Penguin ( おっぽーる )Translator:Censored: Yes (Mosaics)Version: 1.0OS: WindowsLanguage: English ()Store:Other Games:Genre:2D Game, 2DCG, Anal Sex, Ahegao, Bdsm, Big Ass, Big Tits, Blackmail, Blowjob, Bukkake, Censored, Cheating, Corruption, Creampie, Exhibitionism, Groping, Group sex, Handjob, Humiliation, Internal view, Japanese Game, Lactation, Male Protagonist, Male Domination, Masturbation, Multiple Penetration, Multiple Endings, Netorare, Oral Sex, Parody, Pregnancy, Prostitution, Rape, RPG, Shota, Sex Toys, Spanking, Titfuck, Urination, Vaginal Sex, VoicedHow to install:1. Extract and run.Translator Notes:Just after the 4th choice in the game, you are supposed to have the option Always Dash set to off otherwise the message keeps popping up, as during that instance you the game promotes you to not use the dashbutton (shift key) and walk at normal speed, the message shows up when ever you press the shift key, and ig the always dash button simulates the shift key being pressed so the message keeps popping up.You can so that I can continue doing this as a hobby.Required: Patch the game with the latest fixes/changes by running
Afterseen: Two Weeks in Barcelona (v0.1.0) by Hushware
Some or all visuals in this game were created with AIYour girlfriend Giulia leaves for a two-week business trip to Barcelona with her best friend and colleague Sara and her new boss, Marco: charming, rich and always around. You stay home in Milan with only your phone. Every message you send changes what happens, and how much she tells you. Stay close, let your jealousy push her away, or push her toward Marco yourself.And she's not the only one texting you: her sister Elena, her best friend Sara, Nina from the apartment across the landing, Amara from your office, Giulia's mom Patrizia and your friends Fede and Ricky all have their own ideas about how you should spend these two weeks.Last update: 2026-09-29Released: 2026-09-29Creator (developer): HushwareCensored: NoVersion: 0.1.0OS: Windows, AndroidLanguage: EnglishGenre:AI CG, Male Protagonist, Netorare, Sharing, Cheating, Harem, Corruption, Voyeurism, Teasing, Big Tits, Oral Sex, Masturbation, Multiple Endings, Text Based, RomanceHow to install:Windows:1. Extract and run Afterseen.exe.Android:1. Install the APK (allow installing from unknown sources).Saves carry over between versions.Changelog:v0.1.0 - First release- Days 1-2 of 14 (~35-40 min per playthrough, 40-60 choices)- 4 routes (Vanilla / Cheating / NTR / NTS), locked at the end of Day 2- 8 chats: Giulia, Elena, Sara, Nina, Amara, Davide, Patrizia + "The guys" group chat (Fede, Ricky)- 44 photos + 5 animated clips + 13 statuses (26-46 per playthrough), some only unlocked by specific choices- One explicit moment per route at the end of Day 2- Catch lies with replies; a recap of what you caught and missed at the end- WhatsApp-style statuses, Journey app with your route and the clues you caught, marks on decisive replies, choose your name, group chats, Contacts app with everyone's profileDeveloper Notes:This is the first update. The story is a slow burn over 14 in-game days, 2 days per update, every 3-4 weeks. Your route locks at the end of Day 2, from what you actually did: Vanilla, Cheating, NTR (through Sara's eyes or in the dark) or NTS. The Journey app shows where you're heading, then the route you're on. v0.1 is mostly teasing and nudity, with one explicit moment per route at the end of Day 2. Feedback on the routes and the pacing is very welcome.Routes: Vanilla (nobody cheats) · Cheating (you cheat on her, in secret) · NTR (she cheats on you, in secret) · NTS (you both see others, openly). The route locks at the end of Day 2, based on what you actually did.
