Enable images by confirming you are at least 18 years old.

Human Dairy Farm

3D games

About the game

Having never weaned off his mother, our protagonist developed an affinity for breast milk well into his adulthood. Raised on a dairy farm by his mother alone, his love for his mother grew beyond that of a normal mother and son. But when she rejected his advance, an inner demon awakened in him. He began to question the morality of the human society. He believed his mother shared the same love for him as he did for her, and that the taboos made up by other people are the only reason she rejected him. In order to get her to show her true feelings, he must change her views on the world. But with the world standing between him and his mother, will he succeed?
At the same time, the dairy farm he grew up on had a terrible disease that wiped out all the cows. No longer bound by traditional morality, he formed his own version of morality. He began kidnapping women to be the replacement for cows, which he believed was more moral because he thought humans should drink human milk . But such actions are bound to draw attention. Between him and his mother, between him and his values, the world would not sit idly by as he made his move. Will he be consumed by the old world, or will he forge a new one?
(Right now there is no choice in the game yet. There will be some choices in future updates, leading to different endings, but ultimately this is a quite linear game with few choices.)

Last update: 2023-02-04
Released: 2023-02-04
Creator (developer): SmallestDickest
Censored: No
Version: 0.1
OS: Windows, Linux, Mac
Language: English
Other Games:
Genre:
3DCG, Male Protagonist, Rape, Pregnancy, Lactation, Incest, Slavery, Vaginal Sex, Oral Sex, Creampie, POV, Harem, Male Domination

How to install:
1. Extract and run.

Changelog:
v0.1
Initial Release

Developer Notes:
Rape, pregnancy, lactation
These three themes pretty much summarise the game. The game revolves around capturing new girls to breed and milk, while advancing the storyline. If you like these themes, then I think you will like this game. This is quite a departure from my first game, but I'm actually going back to my roots. I first made fan arts for Vae Victis which you can still see in my signature that were based on these themes.
Frequency of updates
So the first version of the game is quite short. I understand that might put off some people. But for me personally, I prefer releasing the game in small updates, because it gives me more motivation to work on the game every time I feel I have finished something by releasing a new version. Besides, I need some feedback on the game first before I invest too much time into it that maybe no one likes.
Inspiration for the game
Well there are quite a number of inspirations for the game. Real porn is where I mainly draw my references from. But there are a few games that are similar to mine. The first one is of course Vae Victis - Khan, which is what I first used Daz3d to make fan arts for. I think Goblin Lord and Goblin Burrow are also quite similar in that all of these games revolve around capturing defeated girls to breed. But this game doesn't have complex gameplay systems like theirs, only a very linear storyline because I just want to make renders and write stories.

Screenshots

Downloads